Production Stories : Patch Bournemouth

2024 was a year of huge projects, one of which was the design and production of 17 curtains for the newly opened branch of Patch in Bournemouth

The studio was commissioned to create patchwork curtains for the three main public-facing spaces in Patch; The Academy, The Studio and The Market. In these spaces, we played with colour and scale, drawing from the art-deco details of the building and using sail-making techniques to bring a slice of the beautiful Bournemouth coast into the building.

You can find the full project details on the commercial projects page, and here are behind-the-scenes shots of design and production, which took place from the first site visit in October 2023 to installation in October 2024.

We will begin with a few images from the design and production development followed by some amazing before and after transformations for each space.

Reviewing designs and samples on site in July 2024

Production of one of the Market curtains in the studio

Pattern pieces and a complex spreadsheet keeping tabs on all 169 pieces that had to be cut and stitched toegther to form these curtains.

Using every inch of space in the studio with the curtain flowing from the sewing machine down the stairs.

I have divided the images up into the three main spaces so you can see the before and after transformations, to kick us off we’re starting in the colourful Market.

Market

A shot of the curved wall in the market space before the windows were replaced in September 2024

The Market on install day prior to adding the curtains

A shot from the other end of the curved wall from the space I spent almost two days - the top of a ladder!

A momentous moment, after a year of project meetings the first curtain is hung and it fits!

Studio

The studio in July 2024

The studio on install day, a maze of chairs and desks,

The Studio in use, November 2024

Academy

The Academy on install day, the calmest of the spaced the curtains had the biggest impact in here.

The final shot after two days of install and a lot of time up a ladder with a steamer!

To see the completed project head to our commercial projects page here and if you have a project in mind and would like us to consult please get in touch here.

Next
Next

Production Stories : Villages Brewery Beer Can Artwork commission